CarbonMetrics

environmental data mining

 

CER issuance times continue to rise

Issuance_analysis_autosaved

The UNFCCC website contains a list of the 1799 issuances that took place sofar.


The time between end of monitoring period and the issuance has risen to 300 days [median]. Of these 300 days, the project developer needs about 30 [waiting for the final data to become available, writing monitoring report]. The remaining 9 months are spent in the verification and the UNFCCC system.

The monitoring reports of the last issuances were written 6 - 9 months ago; new Executive Boards procedures introduced in the last few months may further slow down the issuance process.

Posted
 

Registered CDM projects per 2 September 2010

You can download any table on a website straight into Excel 2007 using the /data/from web option. I have downloaded all the registered CDM projects from the UNFCCC webpage and visualized them.
The request for review status applies to registration. There are big HFC projects now for which a request for review has been submitted.

http://manyeyes.alphaworks.ibm.com/manyeyes/visualizations/registered-cdm-projects-per-2-sept

Posted
Posterous theme by Cory Watilo.